I began framing in the walls for the new laundry room and hallway closet. Using the salvagable portion of the old hardwood flooring in the laundry room area, I was able to repair the damaged wood flooring in the new hallway to the rear bedroom. The hall closet will be just 7 ft high, leaving a shelf/ledge above it , which will give a more open sense to the hallway.





Bathroom: the tile backerboard for the bathroom floor was laid.



My friend, Jim helped me greatly in framing out the new openings into the new family room from the living room and from the enlarged kitchen.





He also helped me widen the kitchen pass-thru to the rear nook area.



The sunken master bathroom floor structure was framed-in.



And finally, the attic is currently being wired and a closet and stairway half-wall is being framed. Ceiling structure will soon be framed out to level the ceiling height in the attic space.